ALP Group has commissioned its 5th production unit at Gurgaon. Lines has been placed and production has started. The total land and building of this plant is 1500 Sq. Ft.
| Line no |
Purpose |
Capacity per annum |
| Line 1 |
Dual Extrusuion Line |
1.8 Million Meters |
| Line 2 |
Show Molding |
2.0 Million Meters |
| Line 3 |
TPO Belt Weather Strip |
1.5 Million Meters |
Lines Contain
| Roll Forming |
1 NO. |
| Injection Molding ( 100GM. & 300 GM.) |
2 NOS. |
| Stretch Bending (3D) |
1 NO. |
| Punching Press ( 10 & 20 TONNES) |
5 NOS. |
|